SCIDallas Utility Master Plan, Energy Audit, amp; Design
The selected ECMs replaced SCIDallas existing coal with new natural gas and oilfired boilers, and modified their wastewater treatment plant to improve sludge dewatering. A total project cost of, with annual energy savings of, results in a total energy savings of over the next 15 years. Central Heating UMP/IGA: